|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00298
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 10:38:21 AM
Creation date
7/18/2018 2:48:38 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00298
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o ► Land Conservation Division <br /> Dane County Land&Water Resources Department <br /> S Patrick"Sutter,County Conservationist <br /> DATE: May 14, 2008 <br /> TO: Thomas&Roxanna Kleinheinz <br /> Owners <br /> FROM: Jason Tuggle <br /> Erosion Control Specialist <br /> RE: Kleinheinz Garage—Erosion Control Plan, EC2008-0059 <br /> The submitted erosion control plan meets the needs of the site and includes the following <br /> requirements: <br /> 1. The site may only be accessed from Nessa Road using the existing gravel driveway. No <br /> other site access may be used and material deposited in the road must be cleaned up <br /> throughout and at the end of each workday. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan and where <br /> deemed necessary, including the down slope of all soil stockpiles. The silt fence must be <br /> maintained until the site is vegetated and stabilized. <br /> 3. Disturbed slopes greater than 12%must be temporarily straw mulched within 2 weeks of <br /> initial disturbance. An adequate cover of mulch must be maintained throughout the <br /> construction process. <br /> 4. Grading must be confined to the areas shown on the plan. No material storage,vehicle <br /> traffic or grading may occur in the areas identified as undisturbed on the plan. In the <br /> event any of these areas are disturbed, additional erosion control measures will be <br /> required. <br /> 5. The plan includes a construction schedule as follows: <br /> Grading and construction is planned to begin on June 1, 2008. <br /> All disturbed areas must be permanently seeded and mulched by September 1, <br /> 2008. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Land Conservation. This permit will expire on the stabilization date included in the plan <br /> (September 1,2008) and may be amended prior to permit expiration only. This review is <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208,Madison,Wisconsin 53718-8812-PH:608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.com/landconservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.