Laserfiche WebLink
c. Place rock riprap as shown in the construction plan with the toe excavated <br /> down to the stream bed depth. 1,040 total linear feet of rock riprap will be <br /> installed. <br /> d. Place topsoil over rock riprap down to the OHWM. <br /> e. Seed and mulch the disturbed streambank as shown in the construction plan. <br />