Laserfiche WebLink
• 10.194(6)—10.195(1) <br /> (6) Unless otherwise provided herein, a compliance with all conditions contained in the <br /> conditional use permit is required for any original conditional use permit. The holder of the <br /> modification of a communication tower which conditional use permit for any tower on which <br /> significantly alters the appearance or structural collocation occurs shall within 30 days of such <br /> integrity of the tower or which involves the collocation provide the committee with written <br /> installation of antenna or equipment differing in notification of the identity of the collocator and <br /> size and function from that previously installed the nature of the equipment installed. Within 30 <br /> on the tower. The committee shall apply the days of the date on which any collocated use <br /> standards under section 10.255(2), D. C. Ords., ceases, the permit holder shall provide the <br /> when considering an application for a conditional committee with written notice of the cessation of <br /> use permit to allow the modification of an such use. <br /> existing communication tower. In addition, the (9) The holder of a conditional use permit for a <br /> committee shall consider the reasonableness, tower and any user collocating under this <br /> based on economic and technological feasibility, ordinance shall each be permitted to construct a <br /> of conditioning the grant of the conditional use building of no more than 14 feet in height and <br /> • permit upon modifying the tower in a manner 314 square feet in floor area for use directly <br /> which would accommodate the collocation of one incidental and necessary to the use of the tower. <br /> • or more additional antenna arrays. Two or more users of the tower may build a <br /> (7) Upon written inquiry by the committee the single building with a floor area of no more than <br /> recipient of a conditional use permit under this 314 square feet per user sharing the building. <br /> section shall have the burden of presenting Buildings constructed or used by tower <br /> credible evidence establishing to a reasonable collocators shall be subject to conditions <br /> certainty the continued compliance with all established for the conditional use permit for the <br /> conditions placed upon the conditional use tower. <br /> permit. Failure to establish compliance with all (10) Conditional use permits issued hereunder <br /> conditions placed upon the conditional use shall identify the primary type or types of <br /> permit shall be grounds for revocation of the transmission equipment which is to be placed on <br /> permit. In the event the committee determines the subject communication tower. Any <br /> that it is necessary to consult with a third party to communication tower on which the transmission <br /> ascertain compliance with conditions on a equipment so identified is no longer placed or <br /> conditional use permit, all reasonable costs and used for a continuous period of 12 months shall, <br /> expenses associated with such consultation shall upon notification by the committee, be removed <br /> be borne by the holder of the subject conditional by the holder of the conditional use permit issued <br /> use permit. Failure to pay such costs and under this section. If the tower is not removed <br /> expenses or provide information requested by within 60 days of such notification, the county <br /> the committee shall be grounds for revocation of may remove the tower at the expense of the <br /> the conditional use permit. The holder of the holder of the conditional use permit. <br /> subject conditional use permit may provide to the (11) The committee may require that an <br /> committee the names of consultants which the applicant for a conditional use permit under this <br /> permit holder believes are qualified to assist in section provide information regarding the <br /> resolving the issues before the committee. In applicant's then current plans for future <br /> any event, where a dispute arises under this placement or construction of communication <br /> ordinance involving an applicant for a conditional towers in Dane County in addition to the tower <br /> use permit and the holder of a conditional use .which is the subject of the application. <br /> permit hereunder, the committee may allocate [History:cr.,OA 57,1996-97,pub.09/02/97.] <br /> consulting costs and expenses between the <br /> applicant and permit holder. 10.195 STANDARDS FOR KEEPING <br /> (8) A conditional use permit shall not be DOMESTIC 'FOWL IN SINGLE FAMLY <br /> required for collocation on an existing tower RESIDENTIAL YARDS. <br /> permitted under this section, provided the (1) Purpose. The purpose and intent of this <br /> collocated antenna array or equipment is similar section is to provide a listing of standards that <br /> in size and function to that installed by the holder shall apply to the keeping of domestic fowl in the <br /> of the conditional use permit for the tower, does yards of single family residences. The standards <br /> not significantly alter the appearance or are designed to ensure that the keeping of fowl <br /> structural integrity of the tower approved and is done in a responsible manner that protects the <br /> permitted under this section, and is fully in <br /> Page 10-57 <br /> rev. 073113 <br />