|
Help
|
About
|
Sign Out
Home
Browse
Search
April Dane County Code of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1997
>
April Dane County Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 1:39:37 PM
Creation date
11/18/2022 1:39:28 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chapter 14 <br /> (13) provisions to ensure no increase in surface 14.56 ADMINISTRATION AND <br /> water drainage from sites during or after construction, ENFORCEMENT. (1) The zoning administrator <br /> unless water is discharged into existing, adequate shall forward any site-specific plan to the county <br /> drainage areas, specifying all stormwater conservationist for review and approval. There shall <br /> management controls such as outlet control structures be a site erosion control authority principally <br /> or basins necessary to comply with maximum responsible for this review and approval process. <br /> permitted discharges; This authority shall be comprised of the zoning <br /> (14) provisions to prevent mud-tracking off-site administrator and the county conservationist or their <br /> onto public thoroughfares during construction period; respective designees. LCC staff shall review the plan <br /> and, pursuant to the soil conservation service Technical <br /> (15) any proposed modifications to approved plans Guide as adopted by Dane County and notify the <br /> or alterations to accepted sequencing of land zoning administrator of any deficiency in the <br /> disturbing site activities shall be approved by county proposed plan. County staff engaged in this review <br /> zoning prior to implementation of said changes. and approval process shall be certified where <br /> [History: am., Sub. 4 to OA 27, 1993-94, pub. appropriate by the Wisconsin Department of Industry, <br /> 09/30/94,eff. 01/01/95.] Labor and Human Relations for this purpose. <br /> (2) The zoning administrator shall inform the <br /> 14.545 SIMPLIFIED PLAN CHECKLIST. applicant of any deficiency in the proposed plan and <br /> Applicants may submit erosion control proposals the applicant shall correct any such deficiency in the <br /> using simplified checklists of standard erosion control plan before the zoning permit is issued. <br /> practices to be installed on sites, on a standard form (3) The plan shall be implemented prior to the start <br /> approved by Dane County, wherever the following of any land disturbing activity and shall be <br /> conditions exist: the site is not more than 20,000 maintained as proposed throughout the entire term of <br /> square feet in area;the site is not adjacent to and does such activity. The applicant on an approved plan <br /> not directly drain into any sensitive areas nearby; and, shall be referred to as the permittee who is <br /> there is a slope of less than six percent (6%) responsible to the approving authority indicated in <br /> throughout the site. sub. (1) to successfully complete the erosion control <br /> [History: cr., Sub. 4 to OA 27, 1993-94, pub. plan as proposed or consistent with an approved, <br /> 09/30/94,eff. 01/01/95.] amended plan. The permittee shall be liable for any <br /> and all costs incurred resulting from noncompliance <br /> , 14.55 FILING OF EROSION CONTROL PLAN. with an approved plan submitted by that party. <br /> Any person applying for a zoning permit in any Within ten(10)days after completion of an approved <br /> district subject to section 14.53 shall, as part of the plan, where soil stabilization has been achieved, the <br /> zoning permit application process, submit an erosion permittee must notify the authority and the authority <br /> control plan meeting the requirements of section will then arrange an inspection to verify plan <br /> 14.54, or, if applicable, section 14.545. The zoning compliance within ten (10) days after said <br /> administrator and county conservationist shall review notification. When a permittee acts to transfer an <br /> and make a determination as to any adequately interest in property subject to an approved plan prior <br /> prepared plan submitted under section 14.54 within to completion of the proposed steps to attain soil <br /> 10 working days for completeness and performance stabilization,the permittee must secure approval from <br /> competency. Simplified plan checklists submitted the authority to transfer any portion of the permittee's <br /> pursuant to section 14.545 shall be reviewed by the responsibility to the authority for the approved plan to <br /> zoning administrator within two (2)working days for another party. <br /> completeness and adequacy. A zoning permit may (4) All incidental mud-tracking off-site onto <br /> not be issued if the plan is not submitted or is adjacent public thoroughfares shall be immediately <br /> deficient in content. The issuance of a zoning permit removed using proper disposal methods. <br /> shall be withheld pending approval of the plan. (5) As part of the plan approval process,the zoning <br /> [History: am., Sub. 4 to OA 27, 1993-94, pub. administrator shall establish a minimum number of <br /> 09/30/94,eff.01/01/95.] inspections to be conducted. The site of any <br /> regulated land disturbing activity shall be inspected at <br /> least once every 30 days during the active phase by <br /> Page 71 <br /> Revised 4-30-97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.