Laserfiche WebLink
• <br /> 2a-'11 Zoning 10.25 <br /> I <br /> direct. administrator may require: <br /> (2) Zoning t,r-rr►I.i.t5. (e) This application shall be signed by the <br /> owner or his duly authorized representative <br /> • (a) No new building shall hereafter be or agent; provided, however, that, if a <br /> erected, and no existing building shall be prospective owner desires a prior ruling on <br /> added to, structurally altered, moved or . a proposed construction or use before <br /> changed in use, nor shall any consummation of purchase, he may apply • <br /> nonconforming building be repaired or for a permit, and, if a permit be denied, he <br /> restored, in all districts, until a zoning may appeal to the board of adjustment. . <br /> permit has been issued, except as otherwise <br /> provided by law or ordinance. . . (f)Coincident with the issuing of a permit <br /> (, the zoning administrator shall prepare a <br /> (b) Permits shall not be required for card, certifying that a permit has been <br /> accessory farm buildings such as barns, issued. This card shall bear the same <br /> sheds, silos and the like when those number as the permit and identify the <br /> buildings are used in the operation of a construction and premises covered by the <br /> farm, provided that the proposed building permit. This card shall be posted in a <br /> will not be located within a mapped flood conspicuous place on the premises during <br /> plain or within a shoreland area and the construction, and no construction shall <br /> conforms to all of the locational be begun until this card has been.posted. <br /> requirements of this ordinance. If the For purposes of this ordinance, start of <br /> proposed location of an accessory farm construction shall be when any earth <br /> building does not meet the locational disturbing activity takes place that will lead <br /> requirements, a variance and a permit must to the installation of footings, piers, posts, <br /> be requested from the board of adjustment. pilings or foundations. Earth disturbing <br /> activity for the purpose of soil evaluation or <br /> (c)The zoning administrator may require testing shall not be considered the start of <br /> the filing of a scale drawing of the premises, construction. <br /> showing the dimensions of the lot or parcel, <br /> the dimensions of the proposed buildings, (g) Each day a non-permitted structure, <br /> the distance in feet from the abutting street building, addition, alteration or activity <br /> or highway and from the side and rear lot exists shall constitute a separate violation. <br /> line, the size and location of any existing A non-permitted structure, building, <br /> buildings and such other information as he addition, alteration or activity is one which <br /> , deems necessary. He may also require requires the issuance of a permit under this <br /> evidence of compliance with the Dane ordinance but which permit has not been <br /> County Sanitary Code, the .Dane County issued by the zoning administrator. <br /> Land Division and Subdivision Ordinance, . <br /> Dane County Trunk Highway Access (h)Any permit obtained through material <br /> Control Regulations or any other state or misrepresentation shall be null and void. <br /> township access or culvert permit <br /> requirements as a condition precedent to - (3) Inspections of buildings to be made by <br /> the issuance of a zoning permit.The zoning the zoning administrator. <br /> administrator shall not be responsible for <br /> determining the location of lot lines. (a) The owner or his agent shall request <br /> . that the zoning administrator make the <br /> (d) Application for a permit must contain following inspections: <br /> the following: name and address of the <br /> owner of the property, legal description, 1. The first inspection shall be requested <br /> size and location of the building to be when the foundations or basement walls are <br /> erected or moved on or onto the property, completed. <br /> i proposed use of the building or premises, 2. The second or final inspection shall be <br /> type of construction, estimated cost and any <br /> other information a s the zoning made before a certificate of compliance can <br /> Hupp. Ni. 1. 12-81) <br />