|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Ordinance
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1970's
>
1976
>
Zoning Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 2:14:26 PM
Creation date
11/21/2022 2:14:21 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
permits, apneals, variances and amendments related to the flood plain zoning <br /> ordinance. <br /> (4) Submit copies of any required data, variances, amendments, case-by-case analyses, <br /> annual reports, and any other required information to the Department of Natural Re- <br /> sources. An annual summary showing only the numher and types of zoning actions taken <br /> by the County shall be submitted to that Department by the Zoning Administrator. <br /> (5) Investigate, prepare reports and report violations of the Flood Plain Zoning Ordinance <br /> to the Corporation Counsel, with copies to the appropriate district office of the <br /> Department of Natural Resources. <br /> (6) Submit, copies of map and text amendments and annual reports to the Federal Insurance <br /> Administration of the Department of Housing and Urban Development. <br /> (7) Maintain on file a list of all documentations of certified elevations. <br /> (8) ADMINISTRATIVE PROCEDURES: <br /> a. ZONING PERMIT: A zoning permit shall be obtained from the Zoning Administrator be- <br /> fore any new land use, change in use, or development as defined in 10.59 (a) (9) , <br /> subject to the provisions of this Ordinance, may be initiated. An application for <br /> a zoning permit shall be made to Zoning Administrator upon forms furnished and shall <br /> include, for the purpose of proper enforcement of these regulations, the following <br /> data: <br /> 1. Name and address of the applicant and property owner; <br /> 2. Legal description of the property and type of proposed use. <br /> 3. A sketch showing the dimensions of the lot and locations of the buildings from <br /> lot line, centerline of abutting highways and highwater mark of any abutting water- <br /> course; <br /> 4. All information concerning any private water or on-site sewage disposal system to <br /> be installed, including a sketch showing surveyed location of wells, streams, lakes, <br /> buildings, privies and septic tank systems within 100 feet of proposed sewage dis- <br /> posal site. <br /> b. CERTIFICATE OF COMPLIANCE: No development as defined in this Chapter shall take <br /> place, no vacant land in the flood plain shall be occupied or used and no building <br /> hereafter erected, altered or moved, shall be occupied until the applicant obtains <br /> a Certificate of Compliance from the Zoning Administrator shall require that the <br /> applicant submit a certfication by a registered professional engineer or architect <br /> that the finished fill and building floor elevations and other flood plain regula- <br /> tory factors were accomplished in compliance with appropriate flood plain zoning <br /> ,:provisions and other flood plain regulations; the applicant shall submit such certi- <br /> fication for all new construction and substantial improvements. Upon written re- <br /> quest from the owner, the Zoning Administrator shall issue a certificate of compli- <br /> ance for any building or premises existing at the time of the adoption of this ordi- <br /> nance certifying, after inspection, the extent and type of use made of the building <br /> or premises and whether or not such use conforms to the provisions of this ordinance. <br /> Certificates shall be subject to the fees provided in 10.25 (7) (f) . <br /> c. OTHER PERMITS: It is the responsibility of the applicant to secure all other neces- <br /> sary permits from all appropriate Federal, State, and local agencies, including <br /> those required under Section 404 of the Federal Water Pollution Control Act amend- <br /> ments of 1972, 33 U.S.C.- 1334. <br /> • <br /> (b) COMMITTEE <br /> The Committee shall have the duties and responsibilities prescribed in ss 10.255 (1) <br /> of this Ordinance. <br /> (c) BOARD OF ADJUSTMENT <br /> (1) In addition to the provisions of ss 10.26, the Board shall forward a•copy. of all <br /> decisions made under this section (10.50 - 10.59) to the appropriate district office <br /> of the Department.of Natural Resources. <br /> (2) MAPPING DISPUTES: The following procedure shall be used by the Board of Adjustment <br /> in disputes of a flood plain zoning district boundary: <br /> a. Flood district boundaries: When the location of the flood plain or floodway district <br /> boundary is established by experience flood maps or engineering studies pursuant to. <br /> Section 10.52 (b) 10.53 (b) 10.54 (b) of this Ordinance, the flood elevations or <br /> "flood profiles" for the point in question shall be the governing factor in locating <br /> the district boundary. If no elevation or profiles are available to the Board, any <br /> other available evidence may be examined. <br /> - 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.