Laserfiche WebLink
DETAIL SUMMARY <br />SHEET OF MISCELLANEOUS QUANTITIES <br />017-2(64 <br />3� <br />CLEARING & GRUBBING <br />REMOVING GUARDRAIL <br />CONCRETE BASE COURSE, <br />6" I <br />STRUCTURE APPROACH SLAB <br />CONCRETE CURB 8 <br />� <br />GUTTER <br />30" <br />STEEL PLATE BEAM GUARD <br />SODDING <br />SEC. <br />STATIONS <br />STATION TO STATION CLEAR- RUB <br />SEC. <br />NO. <br />STATION TO STATION LIN. FT. <br />SEG LOCATION SQ. TO. <br />NO. <br />SEC. <br />E STATION TO STATION STRUCTURE SO.Y <br />SEG <br />NO STATION TO STATION <br />LOC. <br />TYPE"A <br />LIN. FT. <br />TYPE'b <br />SEC. .;SEC. <br />NO LOCATION LIN. FT. ,: <br />NO STATION <br />LOCATION SQ. TO. <br />ING <br />ING <br />_ <br />_------- <br />IU <br />26+00-27'+00 I <br />1 <br />IU <br />10"W"+20 - 13"W"+20 300 <br />IU 8"WI"+50-12"WI"+50 RT <br />320 <br />IU <br />9"WI"+05-9"WI"+16 STARKWEATH 58 <br />IU E. SIDE CONN. <br />IU B-13-205 <br />IU 27+50-28+00 <br />RT DITCH 50 <br />25"W2"+00 -27"W2"+00 2 <br />2 <br />21"W"+30 -32"W"+80 1,150 <br />8"W2"+80 -9"W2"+15 RT <br />40 <br />9"W2"+16-9"W2"+27STARKWEATHE 63 <br />27+50-42+00 <br />LT 1,4,50 <br />21"WI"+40 MED. <br />15.5 ,I <br />14"WI"+15 <br />LT INLET 15 <br />10"E"+00 -14"E"+00 4 <br />4 <br />3 +10 ( Ill RT <br />5 <br />21"WI"+41.5-21"WI"+62 B-13-205 86 <br />27"A"+50-42+45 <br />RT 1,432 <br />20"WI"+78-21"WI"+43 LT <br />65.5 <br />17"WI"+00 <br />RT INLET 15 <br />18"E"+00 -19"E"+00 I <br />I <br />3"WI"+21-23"WI"+45 B-13-205 89 <br />32"A"+63 -39"A"+20 LT <br />638 <br />B-13-204 <br />21"W2"+50 <br />RT FLUME 20 <br />it"F"+00-12"F"+00 1 <br />I <br />21"W2"+42.5 21"W� 8-13-204 83 <br />39"A"+20-41+15 <br />LT <br />131 <br />23"W2"+41 -24"W2"+06 RT <br />65.5 l <br />23"WI"+40 <br />LT INLET 15 11 <br />0+00-1+00(DARBO) 1 <br />I <br />ABANDONING MANHOLES <br />SIT. MATERIAL FOR PRIME COAT <br />3"W2"+225 -23"W2"+4 B-13-204 97 <br />E. WASH. AVE. <br />23"W2"+40 MED. <br />15.5 <br />15"B"+00 <br />LT FLUME 15 <br />a"M"+oo-5"Ill I <br />1 <br />CATCH BASINS a INLETS <br />21.1 <br />55+92.5-56+13.0 8-13-206 55 <br />8"W1"+80-14"WI"+0 <br />LT <br />522 <br />12"D"+30 <br />RT INLET 15 <br />" <br />B M"t00-9"M"+00 I <br />I <br />SEC. <br />SEC. <br />57+57.0-57+77.5 B-13-206 55 <br />8"WI"+60-11"WI"+ <br />RT <br />278 <br />12"D"+55 <br />LT FLUME 15 <br />' <br />12"M"+00 -13"M"+00 1 <br />1 <br />No. <br />LOCATION M.N. C.B. INL. <br />STATION TO STATION <br />No. <br />GAL. <br />55+92.5-56+13.0 8-13-211 55 <br />II"WI"+00-II"WI1+ <br />RT <br />45 <br />2U 48+00 -50+53 RT. FR. RD. <br />253 <br />13"D"+80 <br />LT FLUME 15 <br />IU <br />32+70 LT. BRT 2 IIU <br />2+40-3+55 (MARO.) <br />90 <br />57+57.0-57+77.5 B-13-211 55 <br />11 "Wl" + 70 - 14 "W'" +161 <br />RT <br />252 <br />1 B-13-211 <br />10"E"+30-IOT4,5C <br />RT DITCH 20 <br />2U <br />44+00-46+00 2 <br />2 <br />9"W"+75 LT I <br />0+80 - I +60 (DARBO) <br />150 <br />9"W2"+4o-14"W2"+4 <br />LT <br />322 <br />55+38-56+03 - LT. <br />65.5 <br />11"F"+80 -12"F+8 <br />RT DITCH 130 <br />47+00-48+00 1 <br />1 <br />10"W"+10 I. I <br />7"G"+00 -22"G"+00 1,170 <br />I <br />8"W2"+82-14"W2"+OO <br />RT <br />520 <br />155+63-56+03 RT. <br />405 <br />II"F"+80 <br />LT C. P. 20 <br />49+00-54+00 5 <br />5 <br />13"W"+95 I <br />I"M"+00 - I3"M"+00 <br />1,070 <br />I3"W2"+80-I6"W2"+05 LT <br />235 <br />56+03 MED. <br />15.5 <br />13"F"+00 <br />LT FLUME 30 <br />57+00-62+00 5 <br />5 <br />I8"W"+ 55 LT I <br />3"C"+10 :: 5"C" + 00 a CULDESAC <br />250 <br />8"W2"+15 -31"W2'+50 <br />LT <br />332 <br />B - 13 -206 <br />16"F"+00 <br />LT INLET 15 <br />O"K"+00-5"K"+00 5 <br />5 <br />19"W"+35 LT I <br />CONCRETE PAVEMENT 911 <br />RAMPS <br />57"A°t67 MEO <br />15.5 <br />UNDISTRIBUTED <br />100 <br />6"P"+00 -7"P"+00 1 <br />I <br />21"W"+20 C I <br />10"B"+00 -19"B"+00 <br />RT <br />57"A"+67 -58"A' +07 LT. <br />40.5 <br />26+30 <br />LT FLUMES 20 11 <br />II"E°+10 RT 1 <br />2U 52'G'+40 -53"G"+22 <br />t '� <br />68 <br />sec. <br />15"B"+00 -16"B"+60 <br />LT <br />.90C <br />160 <br />' , 1 ' <br />57'A'+67 -57'A'+32 RT. <br />65.5 � <br />II"F"+l0 RT I <br />60"G'+50 -61"G"+00 <br />55 <br />NO <br />STATION TO STATION LOCATION SQ. YD. <br />10"D"+00-21"WI'+50 <br />RT <br />72 <br />12U 50+00 <br />LT MED.C.P. 20 <br />REMOVING PAVEMENT <br />15"F"+60 RT I <br />0"J"+00 -0"J"+95 <br />74 <br />IU <br />26+00-44+00 E.B. 4,925 <br />10"E"+00 -27"A"+60 <br />RT <br />896 <br />67"A"+05 -69°A"+08 LT. <br />203 <br />56+10 <br />LT FLUME 50 <br />SEC. <br />16"F"+70 LT I <br />0"K"+20 - 8"K"+30 <br />603 <br />26"A"+00-44+00 W.B. 4,54 <br />12"E"+60- 15"E"+75 <br />LT <br />286 <br />56+10 <br />RT FLUME 50 <br />N0. <br />LOCATION <br />SQ. YO. <br />0+15 (DARBO) rL I <br />I"P"+70 - 3"P"+18 <br />173 <br />9"WI"+16-31"WI"+50 N. B. 300 <br />10"F"+00 -19"F"+15 <br />RT <br />915 <br />i' <br />57+60 <br />LT FLUME 50 <br />IU <br />S.T.H. 30 <br />0+20(DARBO) RT 1 <br />6"P"+65- 7"P"+40 <br />77 <br />'W2'+ 27 - 31"Wf+5C S.B. 350 <br />13"F"+15 -15"F'+50 <br />LT <br />26 <br />STRAW MULCH <br />57+60 <br />RT FLUME 50 <br />35"C"+15-44+00 <br />2244 <br />1+15 (DARBO) RT I <br />SIDE STREETS <br />190 <br />10"B"+00 -20"B"+60 "B"RAM P 724 <br />STREETS a FR, RD <br />63+00 <br />LT INLET 30 <br />E. B. CONNECTION <br />2622 <br />1 +30 (DARBO) LT I <br />10"D"+00-21"WI"+42 D RAMP 9 1,323 <br />2 + 40 -STRUCTURE <br />MARQ <br />66 <br />SEC. STATION TO STATION LOC. <br />SO. YD. <br />63"G"+00 <br />LT INLET 15 <br />N. B. CONNECTION <br />513 <br />I <br />BITUMINOUS CONCRETE PAV T <br />E RAMP <br />10"E"+00 -26"A"+35 1,773 <br />STRUCTURE -3+55 <br />MARO. <br />72 <br />No' <br />3"H"+00 <br />RT INLET 15 <br />X -OVER 43+80 <br />39 <br />3"M"+50 RT I <br />10"F"+00-I8"F"+95 FTAP RAMP B 103 <br />STRUCT.-0"GG'+60 <br />GALL <br />80 <br />IU 29+00 -32+00 RT <br />870 <br />2"J"+00 -3"J"+0 <br />LT SHLD. 100 <br />E. WASH. <br />IT. <br />sec. cQ <br />BIT. MAT <br />6"G"+80-II"G°+42 <br />LT <br />490 <br />34"A"+80 -38"A"+00 LT <br />1,460 <br />7"L"+75 <br />RT FLUME 10 <br />9"Wf"+05-31"WI"+50 <br />5813 <br />LOCATION pqV T <br />NO TONS <br />SURF. <br />CRSE. <br />6"G"+27 -13"G"+58 <br />RT <br />740 <br />20"W2"+00 -21"W2"+80 LT <br />': <br />800 <br />UNDISTRIBUTED <br />100 <br />9"W2"+20 -31"W2'+50 <br />5373 <br />ABANDONING WELLS <br />IU 28+00-44+00 E.B. SHLD 203 <br />11.2 <br />II"G"+70-22"G"+00 <br />LT <br />1,040 <br />23"W2"+00 -23"W2"+3 LT <br />130 <br />X -OVER 13"W"+65 <br />280 <br />sec. <br />26+30-44 +OOW.B.SHLD. 114 <br />6.3 <br />2U <br />44+00-66+00 E.B. 5,384 <br />13"G"+88 -22"G"+00 <br />RT <br />815 <br />II"D"+65-12"D"+00 RT <br />160 <br />X -OVER 20"W"+VO <br />976 <br />NU• <br />STATION LOCATION No. <br />8"WI"+80-12"WI"+50 RT 73 <br />4.0 <br />44+00-65 +00 W.B. 5,113 <br />1"M"+00 - 5"fill <br />LR <br />936 <br />13"E"+50 - 14"E"+80 RT <br />580 <br />MARO. 2+40-3+55 <br />170 <br />IU <br />22"W2"+90 LT BASEMENT I <br />14"WI"+00-32'VJI"+SpsHLD. 253 <br />13.9 <br />0"H"+00 -4"H"+04 °HTAPFR RAMP a 951 <br />5"M"+85 -13°M"+20 <br />LR s <br />1,524 <br />12"E"+60 - 15"E"+75 ME <br />530 <br />2U <br />S.T.H. 30 <br />4"W2"+00-32"W2"+50SHLO.220 <br />12.2 <br />O"J"+00-3"J"tl4 RAMP 1JAPFR,110 <br />3"C"+10 -3"C"+83 <br />LTa <br />RT <br />146 <br />17"G"+50 -21°G"+50 ME <br />670 11 <br />EXCAVATION <br />E B. CONNECTION <br />868 <br />GRAVEL OR CR. ST. BASE COORS <br />"B","D","E",&°F"RAMPsHLD. 173 <br />9.5 <br />O L"+00 -8"L"+00 LTAPPA RAMP a 1,630 <br />44+00 - 52+80 <br />2 153 <br />i' <br />2 + 40 - 3 +55(MARl 57 <br />3.1 <br />N RAMP B <br />0"N"+20- 4"N"+OI 931 <br />C.Y. (ABSOLUTE) <br />STATION TO STATION <br />56+10-57+60 <br />367 <br />sEc <br />roNs roNs <br />0+80 - I +60(0AR60) 99 <br />5.4 <br />53"G"+22 -60"G"+ FR.RDa RAD112,42 <br />2U RAMPS <br />2U 47 +00 -51+50 <br />1,550 <br />q ' <br />UNCLASSIFIED <br />FILL <br />61+80-65+00 <br />782 <br />NO. <br />LOCATION BASE SHLD. <br />7"G"+00 - 22"G"+00 770 <br />42.4 <br />0"I"+95 - 5"I"+17 FR. RD 8RADII 1,362 <br />2"H°+10 -4"H"+20 <br />LT <br />244 <br />53 +00 -56+ 10 <br />rRT <br />1,170 <br />26 t 00 - 33+00 <br />9,726 <br />4,253 <br />IU <br />26+00-44+00 E.B. 2_50 600 <br />1"M"+00 -13"M"+00 703 <br />38.7 <br />3"P"+18 -6"P"+65 FAIR OAKS 1,770 <br />3"H"+25 -3"H"+92 <br />RT <br />80 <br />57+30-61+50 <br />1200 <br />p33+00-35+00 <br />13,686 <br />0 <br />26"A"+00-44+OOW.B. ,120 370 <br />3"C"+10 -5'b"+00 117 <br />6.4 <br />1"J"+50 -3"J"+00 <br />RT <br />168 <br />54"A"+50 -56"A"+40 <br />620 <br />1!35+00-40+00 <br />21,689 <br />0 <br />0 I <br />00960 <br />70 <br />1 ,400 <br />0 <br />REMOVING CURB 81 GUTTER <br />9"W2"+15-31"W2"+5OS.B.75 <br />8"W"+40 9"WD+IORESURF. 50 <br />2.ESAC <br />7E <br />N <br />0'.N"+04 -2"N"+80 <br />LT <br />290 <br />64"A"+00 -69'A+00 LT <br />2,000 <br />0+00- 69+00 W.B. 19 00 <br />23,516 <br />SEC. <br />12"B"+20-40+00 "B" 1,900 40 <br />,DRIVEWAYS 30 <br />1.6 <br />CONCRETE SIDEWALK 7 <br />O"N"+30-I"N"+00 <br />RT <br />78 <br />3"K"+50 -7"K'+50 RT <br />710 <br />"WI"+00-21"WI"+60 <br />2,042 <br />1,819 <br />NO. <br />LOCATION <br />LIN. Fr. <br />I I "D"+95 - 16"D" +00 "D" 720 IID <br />TEMPORARY CONN. 1068 <br />56.6 <br />SEC. <br />$Q. FT. <br />FRONTAGE ROADS <br />"W2"+00 -21"W2"+60 1,700 <br />5,700 <br />IU <br />8"W"+40 -9"W"+20 RT. <br />105 <br />" <br />11,150 170 <br />NO. <br />LoLOCATIONoN0"E"+90-17"E"+65"E" PART. NON- <br />52"G"+72 -53"G"+23 <br />LT <br />51 <br />3"WI"+20-32"WI"+00 632 <br />1,750 <br />8"W"+75 -9"W"+10 MEQ <br />70 <br />11"F"+30-17"F"+15"F" 1,030 1801 <br />IU <br />I"W2"+33-11"W2"+55 LT 120. <br />53"G"+23 -53"G"+48 <br />RT <br />40 <br />3"W2"+20 -32"W2"+00 700 <br />2,900 <br />9"W"+35 -9"W"+75 LT. <br />40 <br />2+40 -3+55 Ill 250 <br />53"G"+70 -56"G"+55 <br />LT <br />305 <br />MARKER POSTS <br />i 10"B"+00 -21"B"+00 <br />7,094 <br />132 <br />17%"+00 -17"G" +30 RT. <br />30 <br />0 + 80 - 1 + 60 DARBO 460 <br />2U 44 +00 - 66+00 E.B.SHLD. 358 <br />1 19.7 <br />53"G"+80 -56"G"+68 <br />RT <br />316 <br />_ <br />10"D"+95 - 16"D"+38 <br />AND 12,865 <br />138 <br />I7"G"+65-17"G"+80 RT. <br />25 <br />1 <br />l7"r3"+20-22"G"+OOFR.RD3,OsO <br />44+00-69+OOW.9.SHLD 361 <br />19.8 <br />12U <br />2"P"+95 -3"P"+15 LT 110 <br />57"G"+14 -60"G"+03 <br />LT <br />304 <br />SEC_ STATION Loc. <br />NuueeR, <br />10"E"+08 -18"E"+30 <br />3,649 <br />1,807 <br />20"G"+80 -20"G"+90 RT <br />15 <br />3"C"+10-5"C"+OOCOMM. 400 <br />11 ..". ,,"L",&"N"RAMPsHLD. 148 <br />8.1 <br />57"G"+10 -59"G"+94 RT <br />310 <br />N0. <br />10"F"+00 -18"F"+30 AND 21,030 <br />2,417 <br />21"G"+20 -21"G"+35 RT. <br />15 <br />7"C"+35 COMM. 290 <br />52"13"+40-53"13"+22 45 <br />2.5 <br />60"13"+24-60"13"+50 <br />RT <br />40 <br />IU 32+45 LT <br />2 <br />1,1 6"G"+50 -22"G"+78 <br />3,724 <br />800 <br />0"Il-13"M"+OOMCCOR.2,950 <br />60"G"+50-61"G"+O0 37 <br />2.0 <br />R <br />CONCRETE SIDEWALK 5 <br />60"G"+50 -61"G"+00 <br />LT <br />50 <br />42+70 LTBRT <br />2 <br />"O"K"+25-8"K"+30 <br />1,877 <br />88 <br />DRIVEWAYS & SIDE ST. 370 <br />0"1"+20-0"1"+95 49 <br />2.7 <br />0"1"+00-0"1"+95 <br />LT <br />95 <br />12"E'+00 RT <br />I <br />0"M"+80 -6"M"+00 <br />568 <br />434 <br />2U <br />6"P"+40 -7"P"+25 LT. 8 RT. <br />170 <br />TEMPORARY CONN. 960 <br />O"K"+20 - 8"K' +30 392 <br />21.4 <br />SEC.LOCATION <br />SQ. FT, <br />p"1"+95 -5"I"+20 <br />LT <br />I 4 <br />I I"F"+80 LT 8RT <br />2 <br />6"Ill 13"Il <br />465 <br />4,141 <br />1"P"+70-3'P"+I8 114 <br />1 6.3 <br />N0, <br />PASNOWI"t"+90-5"1"+15 <br />RT <br />340 <br />16"F"+00 RT <br />I <br />I"P"+70-7"P"+50 <br />983 <br />0 <br />2U <br />44+00-66+00 E.B. 6501,280; <br />6"P"+65 -7"P"+40 51 <br />2.8 <br />JIU <br />8"WI"+50 RT 35 <br />0"K"+47 -3'l40 <br />LT <br />350 <br />12"Ill LT a RT <br />2 <br />UNDERCUT <br />6,500 <br />- <br />44+00-69+00 W.B. 4,8001,400 <br />SIDE STREETS 125 <br />6.9 <br />8"WI"+84-9"WI"+10 LT 135 <br />0"K"+56 -7"K"+50 <br />694 <br />3"C"+10 -3"C"+83 <br />70 <br />105 <br />REMOV.tNG CONCRETE SIDEWALK <br />5 G"+40-61"G"+00FR.R 1,810 <br />9"W2"+ 40 -13'W1+4OLT 1,980 <br />FAIR OAKS AVE. <br />SEC, <br />2"H"+00 -4"H"+00 "H" 300 110 <br />15"B"+35 -16"B"+10 LT 592 <br />1"P"+70 -2"P"+30 <br />74 <br />2U 50+00 MEO.al <br />2 <br />LOCATION <br />SO. YD. <br />O"I"+00-.5"I"+15 FR. RD 1,140 <br />3+48-STRUCT. MARQ. 320 <br />I"P"+70-3"P"+I8 <br />JR <br />148 <br />IU <br />9"W"+45 -30"W"+10 LT. <br />920 <br />2"J"+60 -2"J"+95 "J" 100 <br />0+96-1+30 DARBO 108 <br />2"P"+60 -3"P"+18 <br />73 <br />8"W"+50 RT <br />4 <br />0"K"+25 -8"K"+30 FR. 1,730 20 <br />9"G"+05 LT 40 <br />3"P"+I8-3"P"+50 <br />LANDMARK REF. MONUMENT <br />YARDAGE BREAKDOWN BETWEEN LANES <br />9"W"+oo RT. <br />6 <br />2"1_"+60-8"L"+O0 "L" 900 270' <br />3"P"+68 -5"P"+78 <br />LT <br />222 <br />Is APPROXIMATE <br />DRIVEWAYS 9 SLABS <br />1490 <br />0"N"+25 - 2"N"+50 "N" 350 110 <br />4"P"+10 - 5"P"+78 <br />RT <br />168 <br />SEC. LOCATION <br />NUMBER <br />I"P"+70-7"P"+40 0 2,00 <br />OAKS <br />2U <br />I"P"+65-6"P"+65 LT 2,300 <br />6"P"+65 -7"P"+25 <br />LRS' <br />120 <br />No. <br />2U <br />5"P"+00 -6"P"+00 LT. <br />45 <br />DRIVEWAYS a SIDE ST. 760 <br />_ <br />I <br />14"P"+18- 5"P"+66 MED. 1,050 <br />4"P"+15 -5"P"+68 <br />MED. 170 <br />IU 43+86.65 LT <br />2 <br />6"P"+40 -6"P"+65 LT. <br />15 <br />4"P"+43.5 -5"P"+425 RT 990113"W <br />"* 40 RT <br />1 <br />°.83"G"+40 RT. <br />30 <br />153"G"+40 20 <br />13"W"+80 RT <br />I <br />