|
Help
|
About
|
Sign Out
Home
Browse
Search
CTHM-VERONA-USH14RD_S0257
DaneCounty-Planning
>
Clerical
>
Sam
>
Fricky
>
CDs Other
>
HWY Plans 10 Drawers
>
Hwy Plans I-M
>
CTHM-VERONA-USH14RD_S0257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 12:36:28 PM
Creation date
3/7/2025 12:35:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P <br />1 <br />• <br />t-" CENTERLINE <br />y 42'-0` - — --- <br />'- " 331-00 <br />20'-6" ---- — — 20'-0" ----- — —�I-I <br />I 9- <br />'O- <br />ROUNDIN�-` 4'-0"fVARIABLE 0" 1'-0" POI1�R F REDTOONPROFIE9- <br />2I/2-BITUMNOUS I ROUT <br />SLOPE 0.015.FT/- CRUSHEO__BRAVEL OR CRUSHED <br />9" GRANULAR SUBBASE COORS BASE COURSE PAVEMENT WIDENING <br />\ - - -- ---- - <br />12 SEE CROSS SECTIONS <br />S. <br />\" TYPICAL FINISHED SECTION IN URBAN SECTION <br />21/2 CURB S GUTTER STA. 11+00 TO 11+80 LT. a I1+00 TO 11+73 RT. <br />-' - - BITUMINOUS CURB 6 GUTTER STA. 11+80 20+62.8 d 11+73 TO 20+62.8 RT <br />WARPED BITUMINOUS CURB 81 GUTTER SECTIONS STA. 15+00-19+50 RT. <br />�`----9" ��--8" FERTILIZE IN SEED CONC. WALK STA. II+i3 TO 16+93 RT. <br />w r w w FERTILIZE 6 SEED_\ <br />SIDE ROAD "A" BLACK TOP CURB 6 GUTTER STA. 0 A +26 TO 0 A +15 <br />BLACK -TOP CURB 6 <br />GUTTER <br />\ �-CENTERLINE <br />--- ---- -- 15'-0" - -- - 15'-.0" - ------- <br />4'-0"--- - I I'- 0" --- Il' -O" - -- 4'-0" <br />2-'.7 BITUMINOUS MAT POINT -REFERRED TO ON PROFILE I2'-10" 3'-2" j�VARIABLE _ <br />- - <br />AR.I MIN. 3' MpA <br />VARIABLE % <br />q,1 $POPE B"CRUSHED GRAVE OR g"GRANULAR_SUBBASE COORS SLOPE 0.013 FT/FT. /2�-O" <br />CRUSHED STONE BASE COURSE 0-1 <br />HALF SECTION IN FILL HALF SECTION IN EARTH CUT <br />ROUNDING TYPICAL FINISHED SECTION FERTILIZE BI SEED <br />STA.20+62.8 TO 475*59.4 ; SIDE ROAD'E' 3'E'+50-3'E't82 B 4'E'+18-4'E't50------� <br />3' <br />CENTERLINE <br />15'- 0" 5'- 0 <br />--- - <br />Il' -O" - 4'- 0" <br />INT REFERRED ON PROFILE 2'-I 2'-2" VARIABLE <br />3 <br />- - ---'- - <br />VARIABLE <br />2' -,,pp MIN. <br />6" GRANULAR SUBASE ' . 6! UNDERCUT._ <br />COURSE SLOPE 0:013 FT./f T. /O -I _ <br />HALF SECTION IN ROCK CUT <br />I TYPICAL FINISHED SECTION <br />1_CENTERLINE <br />-- 28'-0" - 10" — <br />11'-0" - •-- II' -0"--- <br />R 3'-0" 2'-10" VAR3'IABLE <br />-0"'1' <br />JRFACING 2" P I T REFERVAR- TO ON PROFILE 1h.rp <br />B — _ — — — - _ VARIABLE <br />1�-1"�Mlh. <br />B"CRUSNEQ_-OR _AV_Q_ERUSHEjL SLO-PE__ 10-I <br />BASE COURSE 0.015 FT./FT. 1 <br />HALF SECTION IN FILL HALF SECTION IN CUT <br />TYPICAL FINISHED SECTION FOR SIDE ROADS "E" -"M" <br />R \ STA. OE"+00-3"%+S0. 4`� "+ 50— 9-E-+p0OUNDING ,4M+65 -8"M + <br />�OSTA. IM+50 -3 M+35 <br />r-CENTERLINE <br />- -- W"VARIABLE TO MATCH EXISTING ROAD -- <br />4'_0" VAR. 10'-O" - 10' -Ow I VAR. 2'-2", <br />POINT REFERRED TO ON PROFIL IN. <br />2" BITUMINOUS MAT 2' <br />SLOPE O.OIB FT./FT. <br />A-1 SLOPE -- -" — 6"CRUSHED GRAVtI OR CRUSNE_ <br />STONE BASE COURSE <br />OQE HALF SECTION IN FILL HALF SECTION IN CUT <br />oU LNG Zy2\ NOTE TYPE OF SURFACING TO MATCH EXISTING SURFACE <br />— TYPICAL SECTION FOR SIDE ROAD <br />�--VARIABLE--� <br />VAR. <br />p i- 1'-l+IN <br />1 <br />ROUNDING <br />ROUNDING <br />. In <br />S0257(3) <br />STANDARD ABBREVIATIONS <br />C UNCI ASSIFFD EXCAVATION <br />F = FIL L C.P.= CULVERT PIPE <br />B= BORROW W=WASTE <br />C.M.P A.= CORRUGATED METAL PIPE ANCH <br />S.P.P.A.=STRUCTURAL PLATE PIPE ARCH <br />APPROVED DETAIL DRAWINGS ARE <br />A:� FOLLOWS <br />DETAIL <br />PLATE NO.' <br />PRIVATE ENTRAAES 3 SIDE ROADS <br />1-3.1.1 <br />CONCRETE CURS d _'UTTER <br />3- 1.1.4 <br />RIP RAP FOR CULVERT <br />6--2.4.2 <br />RIP RAP AT S.R. B P.E. CULVERTS <br />STRUCTURAL PLATE PIPE ARCH B <br />CORRUGATEu METAL PIPE ARCH <br />6-5.3.1 C <br />MARKER POSTS 9 MARKER POSTS FOR R/W <br />7- 1.3.3 <br />CONSTRUCTION BARRICADE <br />7-4 1.2 <br />CABLE GUARD FENCE <br />7-2 3 5 <br />STEEL ELATE SEAM GUARD <br />7- 2 4.4 <br />DITCH CHECKS <br />s <br />B-131 <br />PIPE CATTLE PASS (72'; <br />6-7.11 <br />OBLITERATING OLD ROAD <br />1-41 <br />INTERSECTIONS AT GRADE <br />9-1.1.3 <br />GENERAL NOTES: <br />NO TREES ARE TO BE REMOVED WITHOUT THE <br />THE APPROVAL OF THE ENGINEER <br />SHRINKAGE VARIABLE ESTIMATED AT 0-40% <br />THE EXACT LOCATION Of PRIVATE ENTRANCES <br />TO BE DETERMINED IN THE FIELD BY THE <br />ENGINEER <br />4"INCHES OF SALVAGED TOP SOIL TO BE PLACED <br />ON ALL CUT 8 FILL SLOPES AS DIRECTED <br />BY THE ENGINEER <br />ALL RIGHT OF WAY EXCLUSIVE OF THE ROADBED <br />AND AREA ALREADY COVERED WITH SUITABLE <br />GRASSES SHALL BE FERTILIZED 8 SEEDED <br />BIT. SURF NOT PART OF THIS CONTRACT. <br />TYPICAL CROSS SECTION <br />q FOR <br />ROUNDING <br />30 FT. ROADBED <br />
The URL can be used to link to this page
Your browser does not support the video tag.