|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01509
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 10:53:27 AM
Creation date
10/23/2015 10:53:20 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01509
Town
Cottage Grove Township
Section Numbers
33
AccelaLink
DCPCUP-0000-01509
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Recommended Conditions of Approval <br /> 1. The applicant shall comply with all conditions and best management practices required in the <br /> erosion control plan# approved by the Land Conservation Department on <br /> Any erosion control structures shall be maintained according to a schedule approved by the <br /> Land Conservation Department. <br /> 2. Prior to commencement of extraction operations,the applicant shall submit a report signed <br /> by a licensed, qualified engineer to the Zoning Administrator. This report shall certify that <br /> all constructed basins,trenches, retention berms and other erosion control measures match <br /> the elevations and design standards indicated in the erosion control plan. <br /> 3. The applicant shall apply for, receive and maintain all other required local, state and federal <br /> permits. <br /> 4. The operator shall develop and operate the site according to the revised site plan dated <br /> and the operations plan dated July 28, 1998. <br /> 5. Operations shall cease and reclamation shall be completed by no later than July 1, 1999. <br /> 6. The operator shall post and maintain at all times a bond or an irrevocable letter of credit in <br /> favor of the Town of Cottage Grove and Dane County in the amount of$1f690. <br /> 0 (-Pt/sit.- <br /> 7. Off-site removal of subsoil overburden shall not be allowed. <br /> 8. All drive aisles shall be either graveled or paved according to the revised operations plans, <br /> and shall be maintained in a dust free manner in accordance with local, state and federal <br /> regulations. <br /> 9. Hours of operation shall be from 6:00 a.m. to 6:00 p.m., Monday through Friday, and from <br /> 8:00 a.m. to 3:00 p.m. on Saturday. Blasting, crushing, screening or washing shall not occur <br /> before 7:00 a.m. on Monday through Friday and 8:00 a.m. on Saturday. No operations of <br /> any kind shall take place on Sundays or legal holidays. Hours may be extended temporarily <br /> if approved by the town board,with written notification given to the County Zoning <br /> Division. <br /> 10. Trucks shall exit the site directly to the USH 12 & 18 reconstruction project rather than to <br /> CTH N whenever possible and subject to any required Wisconsin Department of <br /> Transportation approvals. The operator shall work with the Wisconsin Department of <br /> Transportation and highway project contractors to accomplish this goal. Direct access to <br /> USH 12 & 18 shall be prohibited when reconstruction is not occurring in the portion of the <br /> highway project adjacent to the CUP area. <br /> 11. The safety fence shown on the revised plans shall be a minimum of 5 feet in height. The site <br /> shall be visibly signed"no trespassing" at regular intervals around the perimeter of the site. <br /> When the extraction site is not open,the access road onto CTH N shall have gates securely <br /> locked. <br />
The URL can be used to link to this page
Your browser does not support the video tag.