|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01509
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 10:53:27 AM
Creation date
10/23/2015 10:53:20 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01509
Town
Cottage Grove Township
Section Numbers
33
AccelaLink
DCPCUP-0000-01509
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12. All drilling and blasting shall be conducted in such a manner as to have a minimum impact <br /> on surrounding landowners. The applicant shall maintain a list of neighbors who have <br /> requested to be contacted, and shall contact all neighbors on such list by phone prior to any <br /> drilling or blasting. All blasting shall be monitored by seismograph. <br /> 13. There shall be no bulk fuel stored on the site. <br /> 14.No water shall be removed from the site in order to maintain groundwater discharge to <br /> adjacent areas. <br /> as rtcrtsgp� <br /> 15. The operator shall use water spray bars in the crushing process to reduce dust!' Use of spray <br /> bars is not required when the temperature is below freezing. The operator shall spray the site <br /> with water if and when needed to control dust. <br /> 16. The operator shall require all trucks, excavation, crushing, screening and washing equipment <br /> to have muffler systems which meet or exceed the current industry standards for noise <br /> abatement. <br /> 17. If the Highway Commissioner determines that improvements to the intersection of the access <br /> road and CTH N are necessary as result of the mineral extraction operation,the operator shall <br /> improve such intersection at its expense to the specifications of the Highway Commissioner. <br /> The operator shall not be responsible for improvements associated with the planned <br /> reconstruction of CTH N. <br /> Please feel free to call me at 267-4115 if you have any questions or comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.