Laserfiche WebLink
stone, every 75 to 100 feet) and silt fences. See Exhibit A. <br /> Also we propose to construct a two to three foot berm along the southeast portion of <br /> the site to filter any potential storm water runoff. The berm will be constructed of <br /> stripped topsoil/overburden and will be seeded. Also, there will be a retention basin <br /> constructed in the northeast corner of the site to contain surface water. In addition, <br /> there will be banks constructed on the western center edge and the northern center <br /> edge of the subject property. The banks will be constructed utilizing a 1 :1 slope and <br /> will be seeded. <br /> A erosion control plan covering the entire CUP area for the duration of the operations <br /> will be submitted, and approval of an erosion control permit will be received prior to <br /> commencing extraction operations. <br /> Please note that there will not be any pumping of water on this site. <br /> In addition, Exhibit A also shows the location of the retention basin which will be built <br /> and maintained in order to contain surface water on lot P-7. <br /> Reclamation Plan <br /> The subject property will be reclaimed as a future commercial / industrial building site <br /> as part of East Metro Business Park. The property will be restored in phases. As the <br /> initial phases have all the select fill material removed and a new phase is started, the <br /> previous phases will be restored with the topsoil that was stockpiled from the initial <br /> phases or from the stripping of the new phase. <br /> See Exhibit D which shows the final proposed elevations after the select fill sand <br /> extraction process is finalized. <br />