Laserfiche WebLink
the extraction site or off of trucks. Therefore, we propose that the trucks hauling the <br /> select fill not be required to be tarped. The site will initially have a loading / turn <br /> around area in the northeastern corner of the site. <br /> We propose to retain the tree / fence line on the southeast portion of the site. <br /> There will be no temporary buildings or scales on the subject property. We do not <br /> propose or plan on having a crusher, a washer or a screening plant on the subject <br /> property. The only equipment that we propose or plan on having on the subject <br /> property would be a dozer, a backhoe and / or a four wheel loader. The location of <br /> the excavation operations will occur on the site in a phased process. Therefore, the <br /> excavation operations will move from location to location on the site from year to year. <br /> (See Exhibit B) <br /> Bulk fuel would be stored on the subject property during certain peak operational times <br /> of year. We do not intend or plan on storing fuel on the site on a year round basis. The <br /> bulk fuel tank would be provided by Zurbuchen Oil, Inc. of Verona, WI. Pictures of the <br /> type of 550 gallon wheeled tank that would be utilized at the site are attached as Exhibit <br /> C. <br /> Locations within the subject property where extraction will occur. <br /> See attached Exhibit A. <br /> Extraction activity phasing. <br /> See attached Exhibit B. <br /> Erosion Control Techniques <br /> The gravel and blacktop drive way that we propose to construct along the northern <br /> side of the proposed 15 lot business park to Hoffman House Lane will be sloped at a <br /> slight angle to the south to direct any storm water to the rock dams (using 3" clear <br />