|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-01493
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-01493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 3:34:00 PM
Creation date
11/13/2015 3:21:53 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
01493
Town
Burke Township
Section Numbers
5
AccelaLink
DCPREZ-0000-01493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the extraction site or off of trucks. Therefore, we propose that the trucks hauling the <br /> select fill not be required to be tarped. The site will initially have a loading / turn <br /> around area in the northeastern corner of the site. <br /> We propose to retain the tree / fence line on the southeast portion of the site. <br /> There will be no temporary buildings or scales on the subject property. We do not <br /> propose or plan on having a crusher, a washer or a screening plant on the subject <br /> property. The only equipment that we propose or plan on having on the subject <br /> property would be a dozer, a backhoe and / or a four wheel loader. The location of <br /> the excavation operations will occur on the site in a phased process. Therefore, the <br /> excavation operations will move from location to location on the site from year to year. <br /> (See Exhibit B) <br /> Bulk fuel would be stored on the subject property during certain peak operational times <br /> of year. We do not intend or plan on storing fuel on the site on a year round basis. The <br /> bulk fuel tank would be provided by Zurbuchen Oil, Inc. of Verona, WI. Pictures of the <br /> type of 550 gallon wheeled tank that would be utilized at the site are attached as Exhibit <br /> C. <br /> Locations within the subject property where extraction will occur. <br /> See attached Exhibit A. <br /> Extraction activity phasing. <br /> See attached Exhibit B. <br /> Erosion Control Techniques <br /> The gravel and blacktop drive way that we propose to construct along the northern <br /> side of the proposed 15 lot business park to Hoffman House Lane will be sloped at a <br /> slight angle to the south to direct any storm water to the rock dams (using 3" clear <br />
The URL can be used to link to this page
Your browser does not support the video tag.