|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01478
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2015 10:20:51 AM
Creation date
11/20/2015 10:19:07 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01478
Town
Blooming Grove Township
Section Numbers
1
AccelaLink
DCPCUP-0000-01478
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Detailed erosion control plan should include temporary and long-term sediment <br /> control. <br /> 5. Operation and maintenance of the plan. <br /> 6. After finishing the mineral extraction, the runoff control should be addressed to <br /> maintain the peak flows and times of concentration at pre-development condition, and to <br /> reduce sediment according to the Dane County Ordinance. <br /> 7. The site is surrounded by hydric soils. (See ortho photo for location of hydric soils.) <br /> cc: Norb Scribner, Plat Review Officer <br /> Dave Lorenz <br />
The URL can be used to link to this page
Your browser does not support the video tag.