Laserfiche WebLink
COMPOSITE REPORT - Application No. 7151 <br /> Public Hearing 02/24/97 Town of Berry <br /> D. A site plan would be desirable to evaluate the proposal. A preliminary CSM has <br /> been submitted but does not show the road access; only the perimeter of the proposed <br /> lots. In a case where there are so many environmental concerns, the site plan should <br /> show the road to access the lots and its slope and also the general layout of the <br /> driveways. In order to build in those lots, many requirements would need to be met: <br /> • An erosion control permit(necessary in the Town of Berry) <br /> • A special exemption permit from the Board of Adjustment if any of the <br /> following are applicable: <br /> • The Creek is determined to be navigable by the Zoning <br /> Administrator <br /> • There is filling or grading or any deposition of dredged soils in <br /> • slopes of 20% or more <br /> • slopes of 12%to 20% (more than 1,000 square feet) <br /> • slopes over 12% (more than 2,000 square feet) <br /> • A detailed plan involving engineering plans and specific practices to <br /> control erosion below a soil loss standard, which depends on whether the <br /> site drains directly to a water body or not(Section 14.51 through 14.97, <br /> Dane County Ordinances). <br /> , ; *: <br /> cropland= <br /> r <br /> Land taken ' "�� <br /> out of �' <br /> cropland 4E <br /> (approx. <br /> 12 acres) .., <br /> b <br /> iitjX "."' <br /> ". <br /> ,• <br /> ":, , <br />