|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01418
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 1:32:45 PM
Creation date
11/23/2015 2:53:22 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01418
Town
Roxbury Township
Section Numbers
3
AccelaLink
DCPCUP-0000-01418
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
extraction area map." Past practice at the County level suggests that the entire, <br /> extraction site should be fenced with(at a minimum) a woven wire fence with one <br /> strand of barbed wire on the top,with a total height of not less than five feet. If you do <br /> not propose to fence the entire area,we will need some justification why the entire area <br /> need not be fenced. <br /> g) The proposed location of crushing equipment. <br /> 3. A SEPARATE reclamation plan map for both the proposed CUP site (as revised by the <br /> town) and the existing non-conforming extraction site. The plan should show final land <br /> contour lines at no greater than two foot intervals, slopes no greater than 3:1, the proposed <br /> use of the property after reclamation, and potential location(s) for Mussen Road after <br /> reclamation. <br /> In addition, the following will be necessary before you can begin any grading or extraction <br /> activities in the CUP area. (There may be other requirements made as conditions of the <br /> conditional use permit.) <br /> 1. You will have to submit to the Zoning Division an erosion control plan for the property, and <br /> have an erosion control permit approved. You can contact Dave Lorenz at 267-1541 for <br /> erosion control plan requirements. <br /> 2. Because the CUP area includes lands within 1000 feet of Crystal Lake, you will also have to <br /> submit and have approved by the County Board of Adjustment a special exception permit for <br /> earth disturbing activities in a shoreland area. I know that you already applied for special <br /> exception permit earlier in 1997, but the Board of Adjustment denied that request in July. <br /> This is why an entirely new application will be required. The materials required for applying <br /> for a special exception permit are similar to those required for a erosion control permit. <br /> 3. You will also need a zoning permit, which you can get from the Zoning Division. <br /> 4. According one Town suggested condition, you will have to perform (or have performed) an <br /> archaeological survey of the property. The results of that survey should be submitted to both <br /> the Town and County before you begin extraction in the CUP area. <br /> If you have any questions on this information, please don't hesitate to call me at 266-4021. <br /> Sincerely, <br /> —,4/ —7,_!--1Z--- <br /> Mark Roffers <br /> Senior Planner <br /> cc: Jim Gregorius, Zoning Administrator <br /> Steve Reynolds, Assistant Zoning Administrator <br /> Dave Lorenz, Zoning Inspector <br /> Robert Pings, Town of Roxbury Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.