Laserfiche WebLink
MAY 29 '97 O9:38AM TOWN OF WESTPORT P.4/8 <br /> I. Water shall be provided to the development contemplated in the Plat by the <br /> Town public water system. The Town Engineer shall review and approve the design of <br /> the water system included within the Plat property. <br /> 2. All utilities shall be installed underground, and their location approved by <br /> the servicing utilities. <br /> 3. Erosion control and Stormwater drainage and runoff plans shall be approved <br /> by the Town Engineer. <br /> 4. Documentation from the Town Engineer stating that road, sewer, water <br /> stormwater detention/retention, and other required public improvements, have met Town <br /> standards. <br /> 5. Contracts entered into by the Town and Developer for all public <br /> improvements shall be reviewed and approved by the Town Attorney and Town Engineer. <br /> 6. A Development Agreement between the Town and Developer, in a form <br /> acceptable to the Town Attorney, shall be executed requiring the Developer to pay Town <br /> Engineer and Town Attorney review fees. Fees for any and all reviews are to be paid to <br /> the Town prior to the Town's plat approval signature. <br /> 7. A letter of credit for contemplated road, sewer, water, stormwater <br /> detention/retention, and other required public improvements shall be required in amounts <br /> approved by the Town Engineer and in a form approved by the Town Attorney. <br /> 8. The Town shall accept parkland as noted on the plat, as may be added to the <br /> plat and approved by the Town, and/or fees in satisfaction of the Town's parkland <br /> dedication requirements. <br /> FI;\WIP180061621PRPLRES.TOW <br /> 0509971118 2 <br />