|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01293
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 1:50:45 PM
Creation date
12/10/2015 1:49:35 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01293
Town
Middleton Township
Section Numbers
35
AccelaLink
DCPCUP-0000-01293
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
III. The'Kids Express Learning Center <br /> A. Ages of Students/ Hours of Operation <br /> The Kids Express Learning Center, an academically innovative <br /> preschool/kindergarten, has been designed to serve children ages 2.5 through <br /> 6 or 7. Our core program will be offered between the hours of 8:00 a.m. and <br /> 3:30 p.m. with a before and after school option available to assist working <br /> parents who desire additional hours of instruction/care for their children. <br /> Our before school option would be offered one-half hour before school begins <br /> (7:30 - 8:00) and our after school option would be offered for two hours (3:30 - <br /> 5:30). The after school option will also be open to children up to age 12 whose <br /> parents wish to enroll them for academic tutoring and/or enrichment <br /> programing. <br /> B. The Physical Plant <br /> The current school building, measuring 1800 square feet, has been <br /> inspected by State Building Inspector, Charlotte Thompson. A copy of her <br /> Day Care Center Inspection report is included in Appendix A. Prior to <br /> opening our center, we will, of course, meet all necessary state requirements <br /> as noted on Ms. Thompson's report. <br /> We have made plans to add on to the current structure. Those additions <br /> include increasing the size of the cloak room/entry foyer at the building's <br /> north end to 318 square feet, adding a solarium on the east side (954 <br /> square feet), and a solarium on the south side (327 square feet) (See Drawing <br /> A). Discussions regarding these improvements have included private <br /> contractors along with the following government officials: Town of <br /> Middleton Building Inspector Jeff Curtis Crocket; Town of Middleton <br /> Plumbing Inspector, Art Stark; Perry Dahl from Dane County Environmental <br /> Health; and Charlotte Thompson, State Building Inspector. These <br /> professionals will help us by insuring that all additions/renovations meet <br /> required safety and health codes. <br /> Rest room facilities within the current 1800 square foot facility will be <br /> remodeled and upgraded in accordance with the Wisconsin Administrative <br /> Code HSS 55 ( Licensing Rules for Group Day Care Centers) and will meet <br /> requirements of Dane County Environmental Health (Perry Dahl, Inspector) <br /> and Town of Middleton (Art Stark, Inspector). <br /> A playground measuring 2,500 square feet will be constructed at the <br /> southeastern section of our lot (See Drawing A). A chain link fence will be <br /> constructed to surround the playground equipment and toys. <br /> Access to the school will be via a shale road that runs along the northern <br /> border of our lot line leading from High Point Road to the school parking lot <br />
The URL can be used to link to this page
Your browser does not support the video tag.