|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01395
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2016 9:54:21 AM
Creation date
1/29/2016 9:47:00 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01395
Town
Middleton Township
Section Numbers
26, 27
AccelaLink
DCPCUP-0000-01395
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMPOSITE REPORT - Page 3 CUP No. 1395 <br /> E. The Zoning Division has applied zoning ordinance parking standards to determine <br /> that a total of 350 spaces would be required to serve the proposed uses. The <br /> ordinance requirements should be considered the minimum number of spaces <br /> necessary to serve the uses. <br /> F. The applicant's revised site plan includes 350 parking spaces in lots on all sides of <br /> the building and within the garage. Low level lighting will be provided in the lots, <br /> and they will be a sufficient distance and/or screened from adjacent properties to <br /> minimize their impact. At staff's request, the applicant has designated a reserve <br /> area including the potential for 150 future parking spaces if needed (see Exhibit A). <br /> This reserve area would not be developed into a parking lot until it is needed. Staff <br /> suggest that this parking area be developed only if(1) the applicant determines that <br /> additional parking is necessary in the future or(2) County Zoning staff identify a <br /> problem with on-street or driveway parking related to the proposed use. <br /> G. Although the property will remain in religious ownership and use and only a very <br /> small building addition is planned, the intensity of the use will increase significantly. <br /> If the proposed mixed use facility was other than a religious use, it would not be <br /> allowed under A-1 zoning. The Diocese has provided a statement of the extent of <br /> the proposed use of the facility (see Exhibit B). To maintain its classification as a <br /> religious use, the applicant should not make its offices or conference center <br /> generally available to users beyond the type outlined in Exhibit B. <br /> H. The most significant impact of the proposed use would be on vehicle access and <br /> neighborhood traffic. It is difficult to predict the traffic impact of this special use <br /> facility, but traffic would be significantly greater than when the facility was used as <br /> a seminary. Traffic impact would be greatest when conferences are held. <br /> Much of the traffic would continue to access the property via High Point Road. <br /> Because High Point Road is entirely within the City limits, City ordinances regulate <br /> access from that road to the subject property. City Traffic Engineering staff <br /> require that two access points be available to serve this property at all times. To <br /> accomplish this, City staff suggest that the gate to the access point on CTH M be <br /> removed, and that the CTH M access be improved to County specifications. The <br /> the sign marking this access as a service entrance should also be removed. <br /> J. Dane County Highway Department staff note that traffic generated by the facility <br /> will increase, and that the CTH M route will be attractive to many users as it <br /> provides relatively easy Beltline access. Staff indicate that the intersection of CTH <br /> M and the access drive as currently configured cannot safely accommodate <br /> increased traffic to and from the property because: <br /> • It lacks turning and passing lanes. <br /> • Traffic on CTH M is already significant (nearly 10,000 vehicles per day), <br /> and expected to increase (nearly 15,000 vehicles by 2020). <br /> • A bend in CTH M south of the access point reduces visibility. <br /> Thus, Highway staff require that the applicant construct an improved intersection <br /> with a passing lane at this access to Highway Department specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.