|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01408
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 3:29:40 PM
Creation date
2/3/2016 3:23:10 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01408
Town
Westport Township
Section Numbers
22
AccelaLink
DCPCUP-0000-01408
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAR 04 '97 O1:42PM TOWN OF WESTPORT P.8/13 <br /> access, and because of all the public and private water access points nearby <br /> making this a totally unnecessary restriction on the use of the property. <br /> 13. Approval of a proper Conditional Use Permit shall be obtained so as to <br /> allow condominiums conditioned upon and consistent with this resolution (see Town of <br /> Westport Resolution No. 97-10), <br /> 14. Approval of a proper certified survey map shall be obtained for the <br /> property to combine the various lots which comprise the parcel into one lot <br /> conditioned upon and consistent with this resolution (see Town of Westport Resolution <br /> No. 9741). <br /> 15. A public sanitary sewage system to provide public sewer to the property <br /> shall be required for development of the property. <br /> 16. The Town Engineer shall review and approve public improvement plans <br /> and specifications for technical compliance and for construction and design. <br /> 17. Review by Town maintenance staff as to the provision of Town services <br /> to be provided to the property and a written report regarding the same to the Board <br /> prior to construction commencing on the property. <br /> 18. Necessary easements or access rights for: storm sewer and sanitary sewer <br /> facilities; storm water drainage; gas, water, electric power and telephone facilities; <br /> emergency or maintenance vehicle access; or, other necessary easements or access <br /> rights shall be provided before construction commences on the Plat property, as <br /> HAWIP1800611481CONBDRES.TOW <br /> 0304970940 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.