|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01262
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 1:43:58 PM
Creation date
2/11/2016 11:31:44 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01262
Town
Christiana Township
Section Numbers
14, 23
AccelaLink
DZPCUP-0000-01262
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
mix, concrete or cold mix bituminous are no different than lime <br /> stone and should be permitted. <br /> 16. Owner/applicant shall perform private testing of all <br /> wells with 1/4 mile of the site with 90 days of opening <br /> the site with copies of the tests being given to the <br /> owners and Township. Owner/applicant shall test the <br /> wells within 1/4 mile of the site yearly thereafter with <br /> the results being given to the residential owners and the <br /> Township. <br /> The applicant objects to this condition since it doesn't <br /> specify what is to be tested for or what effects on the wells is <br /> prohibited. In addition, this is unnecessary since there will be <br /> no effect on the ground water in accordance with the hydrological <br /> study done in conjunction with this conditional use permit <br /> application. <br /> 17 . Dumping or burying hazardous waste is prohibited and <br /> shall void the CUP and owner/applicant shall be <br /> responsible for all clean up costs. <br /> The applicant objects to this condition on the grounds it is <br /> superfluous. This requirement is already regulated by federal and <br /> state law. <br /> 18. The Town Board shall be permitted to inspect the site <br /> following each crushing operation. The owner/applicant <br /> shall notify the Township when the crushing operation has <br /> terminated. The purpose of the Town Board inspection <br /> shall be for inspection of the size of the quarry and <br /> shall review compliance with the CUP conditions. <br /> This condition is objected to as unreasonable and unnecessary. <br /> The applicant's operation is already regulated by Dane County <br /> Zoning, EPA, DILHR, OSHA and the Bureau of Mines. Additional <br /> regulation by the Township is superfluous, duplicitous and <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.