Laserfiche WebLink
PAGE 2, DEED RESTRICTIONS FOR FABER PROPERTY HWY 19/I 90/94 - <br /> C. Buildings shall be designed with sewer and water <br /> system being able to connect to public sewers if a <br /> holding tank, septic systems, and/or wells are used. <br /> When public sewer and/or water is available. <br /> buildings shall be hooked up within 12 mo. and the <br /> existing system removed or abandoned in accordance <br /> with applicable state and county regulations. <br /> 5 . Rubbish Containers: <br /> Rubbish containers and recycling bins shall be enclosed <br /> in masonry enclosure( s) compatible with the building <br /> exteriors <br /> 6. Signs: <br /> All signs shall be in conformance with applicable State <br /> and Count sign restrictions and regulations. <br />