|
Help
|
About
|
Sign Out
Home
Browse
Search
1991
DaneCounty-Planning
>
Zoning
>
BOA
>
BOA Minutes
>
1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2016 9:46:22 AM
Creation date
6/16/2016 9:46:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOA Minutes/8/22/91 <br /> Page 7 <br /> (111, IN FAVOR: R. Kuhl OPPOSED: --- COMMUNICATION: --- <br /> Quackenbush/Harvey to hold requested variance from required setback from <br /> right-of-way of Tower Line Road until the September Public Hearing to allow <br /> input from township and allow applicant to consider alternative locations. <br /> Motion carried - 4-0. <br /> Petitions from previous hearings: <br /> #2130. Schkirkie - Dunn - 5/23/91 P.H. <br /> Harvey/Quackenbush to hold in abeyance until October Hearing to allow <br /> applicant to proceed with vacating sufficient right-of-way to remove need for <br /> variance. Motion carried - 4-0. <br /> #2140. L. Windsor Country Club - Windsor - 6/27/91 P.H. <br /> Arts/Quackenbush to hold in abeyance until September Hearing, as per request <br /> of applicant, to allow required engineering data to be completed. <br /> Motion carried - 4-0. <br /> #2142. Ryan - Mazomanie - 7/25/91 P.H. <br /> Quackenbush/Arts to deny requested sideyard variance, due to applicant's <br /> failure to appear at P.H. <br /> Motion carried - 4-0. <br /> #2146. Winch - Pleasant Springs - 7/25/91 P.H. <br /> Quackenbush/Rendall to grant, with conditions, permit fill/grade and retaining <br /> walls as proposed. <br /> CONDITIONS: <br /> 1). That plans and specifications be prepared by a licensed engineer within <br /> the scope of the application, and filed with the Zoning Department before <br /> commencement of any work. <br /> 2). That all work be performed in compliance with approved engineering <br /> standards and all applicable governmental rules and regulations particularly <br /> Section 11.05(4) of Dane County Ordinance. <br /> 3). That there be filed with the Zoning Department a certificate of <br /> compliance by a licensed engineer at the completion of the project. <br /> 4). Permit valid for 60 days from grant. <br /> FINDING OF FACT: <br /> 1). Applicant is attempting to stabilize bank and prevent erosion. <br /> 2). Engineering data has been filed. <br /> CONCLUSION: <br /> 1). The project as planned, with specified conditions; will not_result in <br /> substantial detriment to navigable waters by erosion, sedimentation, <br /> impairment of fish or aquatic life, or safe and healthful conditions. <br /> Motion carried - 4-0. <br /> #2151. Jaworkski - Dunn - 7/25/91 <br /> Quackenbush/Rendall to hold in abeyance until September Hearing variance <br /> requested from sideyard and setback from normal high watermark to allow <br /> applicant opportunity to explore alternative locations. <br /> Motion carried - 4-0. <br /> (11, <br />
The URL can be used to link to this page
Your browser does not support the video tag.