|
Help
|
About
|
Sign Out
Home
Browse
Search
1993
DaneCounty-Planning
>
Zoning
>
BOA
>
BOA Minutes
>
1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2016 9:48:34 AM
Creation date
6/16/2016 9:48:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOA MINUTES/November 18, 1993 <br /> Page 5 <br /> 1 <br />( CONCLUSION: <br /> 1) . Unnecessary hardship was not proven. <br /> Motion carried - 5-0 . <br /> #2465 . Appeal by David Cheney, agent for Robert Schultz and <br /> Waunakee Outing Club for a Special Exception Permit as <br /> provided by Section 11 . 05 (3) to permit filling, grading, <br /> etc. , within 300 feet of Lake Mendota at 4956 Borchers <br /> Beach Road being Lot 7 and Lot 6 Borchers Beach, Section <br /> 33 , Town of Westport. <br /> IN FAVOR: J. Hellenbrand OPPOSED: --- COMMUNICATION: <br /> Town Board <br /> Dreps/Gaskill to grant with conditions permit to fill and grade as <br /> proposed for shoreline stabilization and erosion prevention. <br /> (11, CONDITIONS: <br /> 1) . That plans and specifications be prepared by a licensed <br /> engineer within the scope of the application, and filed with the <br /> Zoning Department before commencement of any work. <br /> 2) . That all work be performed in compliance with aprpoved <br /> engineering standards and all applicable governmental rules and <br /> regulations particularly Section 11 . 05 (4) of Dane County Zoning <br /> Ordinance. <br /> 3) . That there be filed with the Zoning Department a certificate <br /> of compliance by a licensed engineer at the completion of the <br /> project. <br /> 4) . Inspection and approval by Zoning Department upon completion <br /> of project. <br /> 5) . Completion and certification deadline of May 1, 1994 . <br /> 6) . Project to incorporate Winter stabilization measures to <br /> protect water quality. <br /> FINDING OF FACT: <br /> 1) . Professional engineering provided by David Cheney. <br /> 2) . Existing bank and shoreline has been damaged by year ' s of ice <br /> heaving. <br /> 3) . Project will insure water quality of Lake Mendota will improve <br /> in front of subject property by reducing erosion. <br /> 4) . Department of Natural Resources rip-rap permit has been <br /> issued. <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.