Laserfiche WebLink
BOA MINUTES 9/26/96 <br /> PAGE 4 <br /> C <br /> 4) . Subject to all other necessary governmental agency <br /> approvals. <br /> 5) . Inspection and approval by Zoning Department upon <br /> completion of project . <br /> 6) . Permit valid June 15, 1997 with completion and <br /> certification deadline of August 1, 1997 . <br /> FINDING OF FACT: <br /> 1) . Existing drainage swale and culverts unable to handle <br /> present water problems . <br /> 2) . USH 51 improvements project funnels all run-off through <br /> the sanitary district property. <br /> 3) . Drainage area consist of 205 acres . <br /> 4) . Construction by Dane County Highway Department and <br /> Engineering by Warren Myers, Professional Engineer. <br /> CONCLUSION: <br /> 1) . The project as planned, with specified conditions; will <br /> not result in substantial detriment to navigable waters by <br /> erosion, sedimentation, impairment of fish or aquatic life, <br /> or safe and healthful conditions . Motion carried 5-0 . <br /> APPEALS FROM PREVIOUS HEARINGS: <br /> #2765. ANR Pipeline, Sun Prairie and Burke - 8/22/96 <br /> APPEAR: M. Von Drasek, R. Rivard <br /> SAYLES/GASKILL to grant, with conditions, permit to fill and <br /> grade in conjunction with interstate gas pipeline <br /> construction as proposed. <br /> 1) . That plans and specifications be prepared by a licensed <br /> engineer within the scope of the application, and filed <br /> with the Zoning Department before commencement of any <br /> work. <br /> 2) . That all work be performed in compliance with approved <br /> engineering standards and all applicable governmental <br /> rules and regulations particularly Section 11 . 05 (4) of <br /> Dane County Code of Ordinances . <br /> 3) . That there be filed with the Zoning Department a <br /> Certificate of compliance by a licensed engineer at the <br /> completion of the project. <br /> 4) . Subject to all other necessary governmental agency <br /> 5) . Inspection and approval by Zoning Department upon <br /> completion of project. <br /> 6) . Permit valid September 30, 1996 with completion and <br /> certification deadline of November 15, 1996 (with the <br /> bulk of the project completed by November 1, 1996) <br /> L <br />