Laserfiche WebLink
10. Tracking control <br /> A stone tracking pad is provided at the proposed access off Colladay Point Drive. See Details Dl. <br /> 11. Sediment control practices to protect stormwater facilities or storm sewer inlets,existing and <br /> proposed, on or adjacent to the site <br /> Perimeter control will be installed around the entire disturbed area. See Sheet 2. <br /> 12. Site stabilization details&methods <br /> See notes on Sheet 2. <br /> 13. Any other necessary information pertaining to the physical or environmental features of the <br /> site <br /> See Sheets 1-4 and ECSWM memo <br /> Erosion Control Plan Requirements—Performance Standards <br /> 14. Prevent gully and bank erosion <br /> The site is very flat. Perimeter control will be provided and temporary stockpiles will be seeded <br /> after 7 days. If,for some unknown reason, a slope greater than 5:1 is created, erosion control <br /> mat Type 1, Class A Urban will be installed. <br /> 15. Practices must reduce erosion to minimum sheet and rill erosion standards <br /> See attached USLE. <br /> 16. Proof of stable outlet capable of carrying site runoff at a non-erosive velocity <br /> See GECP plan. <br /> Permit Application Requirements <br /> 17. Timetable and construction schedule <br /> See Sheet 1 <br /> 18. Preliminary Review Letter <br /> N/A <br /> 19. Copies of permits or approval from other agencies <br /> Zoning permits will be provided once they are issued. <br /> 20. Itemized estimated cost of erosion control plan implementation <br /> Construction Costs for Erosion Control.. <br /> Item <br /> No. <br /> Material QTY Units Unit Rate Cost <br /> 1 Stone Construction Entrance 1 EA $1,000.00 $1,000.00 <br /> 2 Silt Fence 410 LF $2.00 $820.00 <br /> Total Costs $1,820.00 <br /> 21. Financial responsibility <br /> N/A <br /> 2 <br /> 2187 Colladay Point Drive,Stoughton WI <br /> Erosion Control Application Checklist Comments <br /> August 16, 2016 <br />