|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-04292
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPREZ-0000-04292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 9:54:06 AM
Creation date
11/3/2016 9:43:48 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
04292
Town
Rutland Township
Section Numbers
9
AccelaLink
DCPREZ-0000-04292
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 . No use of the Parcel for dog racing can commence or <br /> occur until all required road improvements are completed in <br /> accordance with the approved plan and Owner has paid in full <br /> for such improvements, as provided in individual agreements <br /> between Owner and the town, county or state. It is agreed <br /> that Owner will enter into a separate written agreements with <br /> the Town of Rutland and Dane County which will, among other <br /> things, provide that Owner will pay 100 percent of the town ' s <br /> and the county ' s costs in connection with such road <br /> improvements. No studies or work on the improvements will <br /> commence until such an agreements +s are executed. �~ <br /> D. CTH "A" Improvements. Owner agrees to reimburse the <br /> County for the total cost of road improvements, as determined by <br /> the County, to County Trunk Highway "A" in the event that traffic <br /> counts on CTH "A" increase by more than 250 vehicles per day over <br /> existing traffic counts, as the existing traffic count may be <br /> adjusted from time to time to account for normal traffic count <br /> changes. <br /> u s,yT 'i a AY�J.L.4t3�i�_ v ��✓�✓i?-L1/ `� /. <br /> } te a /1/p-7" ss 3CTYil�+e.. rs /'Z,,✓4✓6 6- 17:- <br /> E. Road Maintenance. Owner agrees to reimburse the County <br /> for the full cost of road maintenance in such proportion as the "614 <br /> dot„/ <br /> increased traffic count, if any, due to Owner ' s racing operations �rO' <br /> �D7 A� <br /> bears to the total traffic count . 0= 77" <br /> BF. Traffic Control Plan. A traffic control plan <br /> demonstrating how traffic will be controlled during ingress and <br /> egress from the Parcel shall be prepared by Owner at its cost and <br /> shall be submitted to the Rutland Town Board and the Dane County <br /> AELR Committee for prior written approval before the Parcel may <br /> Page 8 of 20 <br /> ZON961e: 0 22389 :CWK: c <br />
The URL can be used to link to this page
Your browser does not support the video tag.