|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-00643
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-00643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:55:46 PM
Creation date
3/7/2017 3:55:07 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
00643
Town
Burke Township
Section Numbers
26
AccelaLink
DCPCUP-0000-00643
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> When stripping is done on the subject property, a Q j <br /> seeded berm from the north gate will be built west along the <br /> Wiganowsky property not less than four feet in height. Also, <br /> a berm will be installed on the length of the subject <br /> property along Reiner Road not less than 7 feet in height <br /> from the Reiner Road center line elevation. The berm will <br /> have a slope that is not steeper than a three to one slope the Reiner Road side . We direct your attention to the <br /> attached landscape proposal for foliage information. When ,,) �# <br /> this berm is built along Reiner Rd. , Madison Crushing will r sfi <br /> also assist the Town of Burke to clean up the ditch line . <br /> These berms will be built by December 31, 1989 . The quarry <br /> will be enclosed by a fence located one foot inside the <br /> property line . <br /> Propsed Road Maintenance <br /> As a part of this application for a Conditional Use <br /> Permit, Madison Crushing offers to cooperate with the Town <br /> of Burke to upgrade the intersection of Reiner Road and <br /> County Highway T. The company would remove the south 50 feet <br /> of Reiner Rd . up to Highway T and undercut as mutually <br /> agreed and replace the rock as needed at no expense to the <br /> Town of Burke . The work would be completed within 90 working <br /> days after the ground thaws in 1988 . <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.