Laserfiche WebLink
4 ,a• 4 • . <br /> bong-Term Plan and Reclaimation Procedures <br /> When the quarry has been depleted, Madison Crushing <br /> will slope the banks to not steeper than a one to one slope, <br /> and will cover the flat areas with at least one foot of <br /> tillable soil. <br /> Duration of Conditional Use Permit <br /> Madison Crushing requests a Conditional Use Permit for <br /> term of 12 years . <br /> Thank you for your consideration and anticipated <br /> cooperation. <br /> Madison Crushing & Excavting Co. , Inc <br /> By: <br /> David C. Crichton, President <br /> By: / <br /> Wm. Ziegler, secretary & Treasurer <br /> /G <br />